University of Wisconsin Physical Plant

Madison, WI
This was a design build contest that we are proud to be part of. The panels were erected in February and took 13 total days. Brick cast into the panels provided the look the university was aiming for and was much faster than conventional block and brick.

The three-story building includes shops and offices for the UW Physical Plant. The first floor is 22 feet tall floor-to-floor. Floors two and three are 14 feet tall floor-to-floor.

PRECAST ELEMENTS

2,000 square feet of Precast Hollowcore
141 Precast Wall Panels (25,100 square feet)

PARTNERS

GC:  Kraemer Brothers
Architect:  Strang
EOR:  Strang